
INDEPENDENT CONSTRUCTION ADVISORY
DELAY & DISRUPTION EXPERT WITNESS
PROJECT PLANNING & PERFORMANCE REVIEW
CONTRACT EOT CLAIM PREPARATION & SUPPORT
SCHEDULE QUALITY AND RISK ANALYSIS
CONSTRUCTION STRATEGY & STAGING
DAVID LEE
BIM FORENSIC ANALYSIS & 4D CONSTRUCTION MODELLING
KREMMER MANAGEMENT GROUP


QUALIFICATIONS
-
Certificate of Technology – Engineering Civil / Structural (Victoria University Melbourne)
-
Certificate of Technology – Mechanical Design Drafting (Victoria University Melbourne)
MEMBERSHIPS
-
Engineers Australia – Member
-
Victorian Building Authority – Registered Building Practitioner
PERSONAL DEVELOPMENT
-
Autodesk Certified Professional
-
Synchro Pro Certified User
PROFILE
-
David Lee is a Member of Engineers Australia and has more than 39 years’ experience in design and documentation of concrete & steel structures, formwork systems including fabrication & installation, construction planning, project management, building operations and maintenance.
-
David specialises in BIM forensic claim investigation, BIM model creation and asset data development, conversion of 2D geometry to 3D model element, integration of asset data to 3D model, 4D simulation, As Planned vs As Built analysis, construction staging, sequencing and constructability, hospital facilities maintenance & operations, asset management, capital & minor works project management.
-
David has a high level of technical and analytical capability and has practical knowledge of industry standard software products, including:
-
Autodesk Revit, Navisworks, AutoCAD, Civil 3D, Autodesk InfraWorks
-
Bentley Systems - Synchro Pro 4D
-
Trimble – Tekla Structures
-
Bluebeam Revu Extreme
-
Microsoft Access Database
PROJECT EXPERIENCE
FORENSIC CLAIMS ANALYSIS (BIM)
G3 Terminal Project, Vancouver Canada (2019-2020) – 4D Consultant – Kremmer Management
-
Reviewed & analysed the delay caused by Material substitution Requests, Technical Queries & On-Hold Drawing register
-
Design changes comparison, overlaying of current & superseded drawings
Port Pirie Transformation Project, Western Australia (2019-2020) – 4D Consultant – Kremmer Management
-
Reviewed & analysed impacts of Technical Queries & Variations raised
-
Reviewed & analysed the installation procedures of the prefabricated modules and Stick built
-
BIM model data extraction
-
BIM Piping Model development
Royal Adelaide Hospital, Adelaide Australia (2017-2019) – Managing Consultant – HKA
-
Developed Structural model for As Planned vs As Built comparison
-
Developed MEP model to identify design noncompliance
-
BIM model data extraction, Building asset register development
-
MEP systems schematic development
Grey Base Hospital, New Zealand (2019) – Managing Consultant – HKA
-
Developed Federated model to identify missing secondary steelwork (MEP supports)
-
Identified and developed Timeline to capture design change requests during construction
-
Compared Designed model vs shop model to identify revision history
Inovyn Project Lynx - Sweden (2019) – Managing Consultant – HKA
-
Developed model views, elevations & sections from Navisworks model for Engineer experts
Riyadh Metro Viaducts Project – Saudi Arabia (2019) – Managing Consultant – HKA
-
Reviewed and assessed claims validity submitted by Subcontractor for changes made to Project BIM Standards during design phase
Premier Inn Terminal 4 – Heathrow Airport, London (2019) – Managing Consultant – HKA
-
Developed 3D model of the concrete foundations & underground utilities to identify clashes
-
Generated As Planned vs As Built 4D simulation
Swan River Pedestrian Bridge – Perth Australia (2018) – Managing Consultant – HKA
-
Extracted and Reviewed steelwork drawings production history from fabricator’s Tekla model
Jakarta Mass Rapid Transit (MRT) – Jakarta Indonesia (2017) - Managing Consultant – HKA
-
Generated of 3D model of the elevated Railway bridge and stations.
-
Developed 4D construction simulation for As planned vs As Built comparison
Lobo Lobo Bio Refinery Project – Philippines (2019) – Managing Consultant – HKA
-
Reviewed Plant layout & drawing revision history to identify extent of changes made during construction
RMIT University, Design Hub Project, Melbourne VIC (2011) – BIM Consultant – Kremmer Management
-
Developed 3D model of the concrete and steel structures
-
Generated 4D simulation for Baseline vs Actual comparison
PROCESS PROJECTS
Rockingham East Waste to Energy Project, Western Australia (2019-2020) – 4D Consultant – Kremmer Management
-
Waste Bunker foundation model development
-
Concrete structures 3D volume & model quantity take off
-
Reviewed & analysed the interference of the Boiler support structures with boiler equipment during steelwork installation
Kwinana Waste to Energy Project, Western Australia (2019-2020) – 4D Consultant – Kremmer Management
-
Integrating project BIM model with Construction schedule & Construction methodology reviews
-
Reviewed & analysed the interference of the Boiler support structures with boiler equipment during steelwork installation
-
3D model Development and 4D sequencing & simulation
-
BIM structural model data extraction
-
BIM Piping Model data development
Alcoa Aluminium Smelter, VIC (1983) - Detail Draftsperson - Johns & Waygood
-
Produced Steelwork erection and fabrication drawings for Pipe racks and steel structures
Tomago Aluminium, NSW (1982) - Detail Draftsperson - Johns & Waygood
-
Produced Steelwork erection and fabrication drawings for Pipe racks and steel structures
HOSPITAL PROJECTS
Epworth Eastern Hospital, Melbourne Victoria (2020) – BIM Model Manager – Special Gases Enterprises
-
Medical Gases System BIM model development
-
Collaborating pipework design with other teams via BIM 360
-
Generated design & installation drawings including system schematic
St Vincent’s Private Hospital, Melbourne Victoria (2016) – BIM Model Manager – Special Gases Enterprises
-
Developed 3D model of the Medical Gases System
-
Generated design & installation drawings including system schematic
St. John of God Hospital, Berwick, Victoria (2016) – BIM Model Manager – Special Gases Enterprises
-
Developed 3D model of the Medical Gases System
-
Generated design & installation drawings including system schematic
Goodwin Crace Retirement Village, Australian Capital Territory (2016) – Steelwork Modeller – Construct Developments
-
Developed 3D model of the primary structural steelwork including connections design
-
Generated Construction drawings, erection drawings & fabrication drawings
Cabrini Health New Clinical Building, Melbourne Victoria (2016) – BIM Model Manager – Special Gases Enterprises
-
Developed 3D model of the Medical Gases System
-
Generated design & installation drawings including system schematic
RAIL PROJECTS
Melbourne Metro Tunnel & Stations PPP, Melbourne Australia (2016-2017)
BIM Manager/ Digital Engineering Manager – Ferrovial Agroman
-
Developed BIM Management / Execution plan
-
Managed BIM Model reviews & Clash detection coordination
-
Generated Underground utilities, existing structures 3D model
-
Established Digital Engineering / Common Data Environment (BS1192) Strategy
-
Developed Construction site layout, tunnel space proofing, spoil material management
-
Construction planning, staging, 4D simulation, constructability analysis
-
Developed Asset Information model strategy
-
Established Drawing standards & model template files
North West Rail Link, NSW (2015) – Temporary Structures 3D Modeller – Construct Developments
-
Developed 3D model of the Reinforcement jigs and Splice table
-
Generated fabrication and assembly drawings
Seaford Rail Extension, SA (2012) – Formwork Designer– Formtech
-
Developed formwork system for Incremental Launch Bridge mould
-
Generated fabrication drawings & assembly drawings
ROAD PROJECTS
Pacific Highway Upgrade (North and South Portal), NSW (2015) – Formwork Designer – Construct Developments
-
Developed 3D model of the formwork system for the Road Tunnel Portal structures
-
Generated fabrication and assembly drawings
Princess Highway Upgrade (Fern Street Bridge), NSW (2014) – Steel Mould Designer – Construct Developments
-
Developed 3D model of the formwork system for Incremental Launch bridge mould
-
Generated fabrication drawings & casting yard set out.
New Gateway Upgrade Project, QLD (2009) – Steel Mould Designer – Formtech
-
Developed formwork system for Segment Match casting bridge moulds
-
Generated fabrication drawings & assembly drawings
Iron Cove Bridge, NSW (2013) – Formwork Designer – Formtech
-
Developed formwork system for Incremental Launch Bridge mould
-
Generated fabrication drawings & assembly drawings
East Link Project, VIC (2007) – Steel Mould Designer – Formtech
-
Developed formwork system for Precast girder beam moulds
-
Generated fabrication drawings & assembly drawings
West Link M7 Project, NSW (2003) – Formwork Designer – Formtech
-
Developed formwork system for Bridge segment match casting mould
-
Generated fabrication drawings & assembly drawings
Western Ring Road Project, VIC (2009) – Steel Mould Designer – Formtech
-
Developed formwork system for Bridge segment casting mould
-
Generated fabrication drawings & assembly drawings
Melbourne City Link Project, VIC (1998) – Formwork Designer – Formtech
-
Developed formwork system for Balanced cantilever match casting moulds
-
Generated fabrication drawings & assembly drawings
PORT PROJECTS
Port of Melbourne Corporation, Webb Dock Redevelopment, VIC (2011) – 4D Consultant – Kremmer Management Group
-
Developed 3D model of Webb Dock facilities and structural to aided 4D master planning
-
Generated 4D Simulations
Port of Melbourne Corporation, Wharf 33 South Redevelopment, VIC (2010) – 4D Consultant – Kremmer Management Group
-
Developed 3D model of existing & proposed concrete & steel structures
-
Generated 4D Simulations
Port Botany Expansion Project, NSW (2008) – Steel Mould Designer– Formtech
-
Developed formwork system for Precast Counterfeit unit mould design
-
Generated fabrication drawings & assembly drawings
AIRPORT PROJECTS
Melbourne Airport, Western Apron Additional Taxiway, VIC (2008) – 4D Consultant – Kremmer Management Group
-
Developed 3D model of Airport Taxiway and associated civil work
-
Generated 4D Simulations to divert Airport traffic during Taxiway shut down & closures
INFRASTRUCTURE PROJECTS
Brooklyn Pumping Station, VIC (1988) - Design Drafting – Melbourne & Metropolitan Board of Works
-
Generated construction drawings for steel platform
-
Developed Pump motors removal and installation sequencing diagrams
Thomson Dam, VIC (1986) - Design Drafting Officer - Melbourne & Metropolitan Board of Works
-
Generated construction drawings for access roads and associated civil works
-
Developed installation drawings for Water supply pipework system
Sugarloaf Reservoir, VIC (1985) - Design Drafting Officer - Melbourne & Metropolitan Board of Works
-
Generated construction drawings for Steel Roof over existing water storage reservoir
-
Prepared site layout drawings
BUILDING PROJECTS
Melbourne Central, VIC (1989) – Design Draftsperson – Lewis Constructions
-
Produced construction & fabrication drawings of Temporary works, steel & concrete structures
-
Developed installation diagrams, staging and sequencing diagrams.
OIL & GAS PROJECTS
INPEX Ichthys LNG Project, WA (2012) – BIM Consultant – Kremmer Management
-
Federated Model development, model data integration & management
-
Identified and developed Timeline to capture design change requests during construction
Gorgon Gas Project, WA (2011) – BIM Consultant - Kremmer Management
-
Construction planning, staging, 4D simulation, model data integration & management
-
Federated model development
CORPORATE ROLE
Royal Children’s Hospital, Melbourne VIC (1991-2011) – Asset Manager / Project Manager – Royal Children’s Hospital
-
Administered the Hospital building assets database
-
Oversaw the operations of the maintenance work orders system
-
Managed Building access control system including master key distributions
-
Managed the operations of the drawing office
-
Performed planned maintenance scheduling
-
Managed Capital works, minor works including building infrastructures upgrade projects
-
Developed the Hospital Master Plan program
-
Managed operation of the Engineering Control Room
STRATEGIC PLANNING SESSION
Grow Your Business
BRANDING & POSITIONING ANALYSIS
Achieve Your Goals
INTRODUCTORY CONSULTATION
Expert Guidance